Chapter 14.50(15) EDGEMONT AUTO SERVICE PROJECT REDEVELOPMENT OPTION ZONE
This chapter is included in your selections.
Sections:
- 14.50(15).010 Purpose and Intent.
- 14.50(15).020 Compliance with Titles 14 and 15 Required.
- 14.50(15).030 Permitted Uses.
- 14.50(15).040 Single Ownership and Control.
- 14.50(15).050 Lot Area, Width and Depth.
- 14.50(15).060 Lot Frontage.
- 14.50(15).070 Yard Requirements.
- 14.50(15).080 Projections into Yards.
- 14.50(15).090 Garbage Collection and Storage.
- 14.50(15).095 Building Height.
- 14.50(15).100 Permissible Lot Coverage.
- 14.50(15).110 Transitional Development Standards.
- 14.50(15).120 Parking, Loading and Access.
- 14.50(15).130 Project Plan Approval/Design Review.
- 14.50(15).140 Fencing Standards.
- 14.50(15).150 Hours of Operation.