Chapter 14.50(30) ENTRY-LEVEL HOUSING (ELH) PROJECT REDEVELOPMENT OPTION ZONE
This chapter is included in your selections.
Sections:
- 14.50(30).010 Purposes and Objectives.
- 14.50(30).020 Compliance with Titles 14 and 15 Required.
- 14.50(30).030 Permitted Uses.
- 14.50(30).040 Lot Area.
- 14.50(30).050 Lot Width.
- 14.50(30).060 Lot Depth.
- 14.50(30).070 Lot Frontage.
- 14.50(30).080 Lot Area per Dwelling.
- 14.50(30).090 Yard Requirements.
- 14.50(30).100 Building Height.
- 14.50(30).110 Distance Between Buildings.
- 14.50(30).120 Permissible Lot Coverage.
- 14.50(30).130 Parking, Loading, and Access.
- 14.50(30).140 Project Plan Approval Design Review.
- 14.50(30).150 Other Requirements.
- 14.50(30).160 Notice of Parking and Occupancy Restrictions.