Skip to main content
Loading…
This section is included in your selections.

(1) No cuts shall be made in street pavement for at least one (1) year after hard surfacing has been installed unless approved by the City Engineer. The use of flowable backfill shall be used in the street cuts for any cuts before the year has expired.

(2) A one (1) inch surface course of all streets shall be provided within three (3) years after a development has been completed or longer if the majority of the buildings within the development have not been constructed or as approved by the City Engineer. The developer shall design and construct all roadways in accordance with Provo City Standards. Wherever the street falls within a high water table area or as determined by the City Engineer, the developer shall place geotechnical fabric under the sub-base material (refer to Provo City Standards). The developer shall provide the City with a fee, as shown in the Consolidated Fee Schedule as adopted by the Municipal Council, in the appropriate amount to pay for the one (1) inch surface course which will follow for each development. This fee shall be placed into a fund and installation of the surface course shall be coordinated through the Provo City Engineering Division in conjunction with its yearly maintenance program. Fees for the surface course shall be determined by the Engineering Division based on its estimated cost for such work to be completed at a future date.

(Rep&ReEn 1999-34, Am 2000-48, Am 2014-32)