Goal 5.4.9 Update annually the five-year CIP and periodically review the ten-year plan to anticipate future projects and the need to upgrade existing electrical infrastructure. As load growth warrants, convert the east 46 kV subtransmission lines with associated substations to 138 kV.
This goal is included in your selections.
5.4.9.1 Coordinate with other City departments concerning current and long-range projects.