The Provo City Industrial Pretreatment Coordinator shall publish annually, in a newspaper of general circulation that provides meaningful public notice within the jurisdictions served by the POTW, a list of the users which, at any time during the previous twelve (12) months, were in significant noncompliance with applicable pretreatment standards and requirements. The term “significant noncompliance” shall be applicable to all significant industrial users (or any other industrial user that violates Subsection (3), (4), or (8) of this Section) and shall mean:

(1) Chronic violations of wastewater discharge limits, defined here as those in which sixty-six percent (66%) or more of all the measurements taken for the same pollutant parameter during a six (6) month period exceed (by any magnitude) a numeric pretreatment standard or requirement, including instantaneous limits as defined in Sections 10.04.050 through 10.04.100, Provo City Code;

(2) Technical review criteria (TRC) violations, defined here as those in which thirty-three percent (33%) or more of wastewater measurements taken for the same pollutant parameter during a six (6) month period equal or exceed the product of the numeric pretreatment standard or requirement including instantaneous limits, as defined by Sections 10.04.050 through 10.04.100, Provo City Code, multiplied by the applicable TRC criteria (TRC=1.4 for BOD, TSS, fats, oils and grease, and TRC=1.2 for all other pollutants except pH);

(3) Any other violation of a pretreatment standard or requirement as defined by Sections 10.04.050 through 10.04.100, Provo City Code (daily maximum, long-term averages, instantaneous limit, or narrative standard), that the Provo City Industrial Pretreatment Coordinator determines has caused, alone or in combination with other discharges, interference or pass-through, including endangering the health of POTW personnel or the general public;

(4) Any discharge of a pollutant that has caused imminent endangerment to the public or the environment, or has resulted in the Provo City Industrial Pretreatment Coordinator’s exercise of its emergency authority to halt or prevent such a discharge;

(5) Failure to meet, within ninety (90) days of the scheduled date, or compliance schedule milestone contained in an individual wastewater discharge permit or enforcement order for starting construction, completing construction, or attaining final compliance;

(6) Failure to provide, within thirty (30) days after the due date, any required reports, including baseline monitoring reports, reports on compliance with categorical pretreatment standard deadlines, periodic self-monitoring reports, and reports on compliance with compliance schedules;

(7) Failure to accurately report noncompliance; or

(8) Any other violation(s), which may include a violation of best management practices, which the Provo City Industrial Pretreatment Coordinator determines will adversely affect the operation or implementation of the local pretreatment program.

(Rep&ReEn 2019-31)